Over the last several weeks the inside of the church has continued to undergo transformation, with the rough block surface smoothed out with a concrete surface. Time to paint.
Today several of us had way too much fun painting the concrete gray a bright white. The ceiling still needs to be painted, but we’ll save that for the Fremont, Nebraska team that comes in two weeks!