Brethren and Cistern

Posted in

Last Thursday we began work on a 2 meter by 2 meter by 2 meter cistern, to assure an adequate water supply in our ministry center during high use times like Sunday morning and the occasional water shortages that occur. There is a mountain of dirt in the back patio of the house.

Tomorrow we will be submitting papers for our remodeling project, which will include putting a roof over the current patio and garage areas, a men’s and women’s bathroom and a relocation of the stairway to the second floor. Stage two of the remodeling will involve construction additional classroom space on the second floor.

Please pray that the construction permits are approved without delay. In the meantime we will be doing work that does not require permits, such as changing the gas lines and hot water heater and other minor modifications.

Leave a Comment

Your email address will not be published. Required fields are marked *

Related Articles

Hearing Aids and Beautification Project

A fairly new outreach for us here is the donation of hearing amplification devices. All we require is that we […]

Read More

Rio Grande Bible Institute and the Landrums

This past Wednesday, son David and I, along with pastor friend Erik Morga and his wife Patty and daughter Annie […]

Read More

Top 10 posts from 2015

Here are the top ten posts from 2015. A sincere thanks to those of you who occasionally visit this site, […]

Read More