Property Progress Pics

Posted in

I’m reposting some pictures that co-worker Tina just put on Facebook. You can see progress on the temporary bathrooms, one of them complete with a white door. Eventually a water tank (much smaller than the cistern-sized one in the picture) will be placed on the roof of the bathrooms to provide flush-able toilets.

The second picture shows a section of wall with tin roof overhead, spaces to be used temporarily for Sunday School rooms, providing shade for the kids.

Work yet to be done…the placement of a door and installation of a window for the main meeting place at the back of the property, and completion of the bathrooms. We hope to definitely be meeting at this property for the April 6 4th anniversary celebration, but may possibly be meeting there this coming Sunday, if all the work gets done.

Praise God for his faithfulness in this project, every step of the way!

Phase #2 of the property development will be to build a two-story building with permanent bathroom facilities, a conference room, an office and a lobby at the front of the property, basically right where the large water tank is sitting now, back to about the rear part of the current temporary bathrooms, or perhaps slightly farther. Samuel’s rending of what Phase #2 will look like is pictured below (last pic).

1 thought on “Property Progress Pics”

Leave a Comment

Your email address will not be published. Required fields are marked *

Related Articles

Hearing Aids and Beautification Project

A fairly new outreach for us here is the donation of hearing amplification devices. All we require is that we […]

Read More

Rio Grande Bible Institute and the Landrums

This past Wednesday, son David and I, along with pastor friend Erik Morga and his wife Patty and daughter Annie […]

Read More

Top 10 posts from 2015

Here are the top ten posts from 2015. A sincere thanks to those of you who occasionally visit this site, […]

Read More